摘要 为保障矿山安全生产和提高经济效益、充分回收利用资源,西南某矿拟改用充填法开采,对新建充填系统进行了工业试验,结果表明,充填系统可在设备工况良好的条件下长时间运行,充填料浆可顺利实现长距离泵压输送,井下充填管路在整个调试过程中未发生堵管,系统工艺流程畅通,达到了预期的目的,为矿山全尾砂胶结充填开采创造了良好条件。 In order to ensure safe production,improve economic benefits and fully recycle resource,filling method would be used in a mine of southwest region,and the industrial tests of new filling system were conducted.The results showed that filling system could keep long time operation under good working condition.Filling slurry can be pumped for a long distance,while underground filling pipelines were not blocked during debugging. The unblocked system process reached intended purpose,which created good condition for whole tailings cemented filling mining.
出处 《矿业研究与开发》 CAS 北大核心 2015年第5期8-10,共3页 Mining Research and Development
关键词 充填系统 运行调试 制浆浓度 泵送充填 Filling system,Debugging on operation,Slurry concentration,Pumping filling
  • 相关文献

参考文献16

二级参考文献79

共引文献183

同被引文献52

引证文献7

二级引证文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部