摘要
文章中论述了工程项目投标可行性决策分析的必要性,分析了通常影响工程项目投标可行性决策的因素,最后采用模糊集合的原理进行定量分析,并建立了工程项目投标可行性决策系统模糊模型。
In this paper,it is discussed that a bid for engineering projects should be attached with a feasibility analysis and a decision.The factors that affect the decision on the feasibility of a bid for engineering projects are studied in detail.Finally,based on the theory of fuzzy set,a fuzzy set model of decision on the feasibility of a bid for engineering projects is established for the purpose of quantitative analysis.
出处
《中国港湾建设》
北大核心
2004年第3期49-51,共3页
China Harbour Engineering
关键词
工程项目
投标可行性分析
决策
模糊集模型
engineering project
feasibility analysis of bid
decision
fuzzy set model