摘要 贵州索风营水电站大坝为全断面碾压混凝土重力坝,采用左右块全断面通仓簿层连续交替上升工艺施工,在施工过程中根据索风营工程气候条件和原材料情况,探索出一套适合于本工程的混凝土质量控制方法,使索风营水电站大坝工程在整个施工过程中处于良好的受控状态,确保了工程施工质量。 The dam of Guizhou Suofengyin Hydropower Station is a full section RCC gravity one,built adopted full section thin slice continuous placing process on both sides.In the construction,a set of quality control methods has been studied according local engineering meteorological condition and its materials.Those methods ensure excellent construction quality in whole building process.
作者 罗明华
出处 《贵州水力发电》 2004年第3期74-77,共4页 Guizhou Water Power
关键词 碾压混凝土重力坝 索风营水电站 质量控制 溢流坝 消力池 construction of conservancy and hydropower project,full section RCC gravity dam,control construction quality,Suofengying Hydropower Station
  • 相关文献

参考文献3

  • 1混凝土外加剂信息3则[J]化学建材,1997(01).
  • 2GB 8076-1997.混凝土外加剂[S],1997.
  • 3DL/T 5150-2001.水工混凝土试验规程[S],2001.

同被引文献12

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部