北京燕山石化两巨型塔器在国内首次使用整体液压连续平移技术安装成功。该项技术可缩短工期,降低费用,提高安装的平稳性。
The integral hydraulic continuous transition technology was firstly adopted in installation of two huge towers of Yanshan Petroleum Chemical Industry Group and the installation was successful.This technology has such advantages as lowering construction time,decreasing costs and improving installation stationarity.
出处
《施工技术》
CAS
北大核心
2004年第6期48-49,共2页
Construction Technology
关键词
巨型塔器安装
SQD型松卡式千斤顶
整体连续平移
installation of huge towers
SQD unfixing holding-latch lifting jack
integral continuous transition