期刊文献+

燕山石化巨型塔器整体液压连续平移技术

The Integral Hydraulic Continuous Transition Technology for Two Huge Towers of Yanshan Petroleum Chemical Industry Group
下载PDF
导出
摘要 北京燕山石化两巨型塔器在国内首次使用整体液压连续平移技术安装成功。该项技术可缩短工期,降低费用,提高安装的平稳性。 The integral hydraulic continuous transition technology was firstly adopted in installation of two huge towers of Yanshan Petroleum Chemical Industry Group and the installation was successful.This technology has such advantages as lowering construction time,decreasing costs and improving installation stationarity.
出处 《施工技术》 CAS 北大核心 2004年第6期48-49,共2页 Construction Technology
关键词 巨型塔器安装 SQD型松卡式千斤顶 整体连续平移 installation of huge towers SQD unfixing holding-latch lifting jack integral continuous transition
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部