摘要
介绍了上海地铁明珠线二期某车站施工过程中对基坑标准段北侧建筑的保护情况,着重阐述了在基坑施工过程中通过信息化管理对房屋沉降的控制措施。
The protection condition of buildings to the north side of the foundation pit during construction process of a railway station for phase 2 project of Shanghai bright pearl railway line was introduced, and control measures for subsidence of buildings through informatization management during construction process of the foundation pit were emphatically described.
关键词
基坑
地铁
信息化管理
房屋沉降
building
subsidence
control
protection
measures