摘要
在离子交换法制备除盐水的实际工艺中,在系统投入运行前需确定最佳的再生工艺条件,现采用多因素多水平正交实验确定了新疆化肥厂动力锅炉水处理系统的最佳再生工艺条件参数。
In the technology of the preparing demineration water, the optimum parameters for regenerating condition need to be decided first before the system starts to run .This paper applied multi-factor and multi-level orthogonal test to decide the Xinjiang fertilizer plant'power boiler demineration water system' optimum parameters for condition of regeneration in the Xinjiang fertilizer plant.
出处
《新疆农业大学学报》
CAS
2004年第2期72-75,共4页
Journal of Xinjiang Agricultural University
关键词
除盐水
树脂的工怍交换容量
再生工艺条件
多因素多水平正交实验
demineration water
operation capacity of ion exchanging resin
technological condition of regeneration
multi-factor and multi-level orthogonal test