期刊文献+

高原融区和多年冻土过渡路段涵洞地基试验研究 被引量:7

In-situ Experimental Study on Railway Culvert in Thaw and Permafrost Transition Regions of Tibetan Plateau
下载PDF
导出
摘要 运用现场测试方法,对青藏铁路两座拼装式涵洞的基础变形、地基土地温及洞口气温的测试结果进行分析,研究多年冻土区涵洞工程对冻土地温状况、冻融过程、冻土上限变化的影响以及涵洞基础的冻融变形特征。结果表明:多年冻土地区修建涵洞工程后,气温对地温的影响增大,致使涵洞下原多年冻土上限附近地温波动明显,地温年变化深度增大;由于场地冻土条件及地温场沿涵身的变化,涵洞基础变形沿涵身表现出明显的不均匀性。 With the field test method, this paper analyzes the results of the foundation deformation, ground temperature and air temperature of two culverts on Qinghai-Tibet railway. It also studies the influence of culvert to the ground temperature state, the thaw and frost process, the change of permafrost table as well as the characteristics of frost heave and thaw subsidence. The analytical results show that ground temperature at the permafrost table waves violently after the culverts are established. It is obviously different from that under natural ground. At the same time, the deformation of frozen soils including frost heave and thaw subsidence is asymmetrical along its axes because of the changes of soil conditions.
出处 《中国铁道科学》 EI CAS CSCD 北大核心 2004年第4期69-72,共4页 China Railway Science
基金 铁道部科技研究开发计划项目(2001G001 C 06)
关键词 青藏铁路 多年冻土 涵洞工程 地温状态 冻胀与融沉 Deformation Foundations Frost effects Railroads Soils Temperature Thawing
  • 相关文献

参考文献6

二级参考文献24

  • 1吴青柏,童长江.冻土变化与青藏公路的稳定性问题[J].冰川冻土,1995,17(4):350-355. 被引量:83
  • 2李述训,程国栋,郭东信.气候持续变暖条件下青藏高原多年冻土变化趋势数值模拟[J].中国科学(D辑),1996,26(4):342-347. 被引量:51
  • 3吴紫汪 程国栋.冻土路基工程[M].兰州:兰州大学出版社,1988..
  • 4陈卓怀.多年冻土地区桥涵基础.第二届全国冻土学术会议论文集[M].甘肃人民出版社,1983..
  • 5叶拔友 杨海容.青藏高原多年冻土区涵洞基础人为上限的确定方法.第二届全国冻土学术会议论文集[M].甘肃人民出版社,1983..
  • 6程国栋 王绍令.试论中国高海拔多年冻土带的划分[J].冰川冻土,1982,4(2):1-17.
  • 7臧恩穆 吴紫汪.多年冻土退化与道路工程[M].兰州:兰州大学出版社,1999..
  • 8程国栋,冻土路基工程,1988年
  • 9武敬民,西安公路学院学报,1986年
  • 10陈卓怀,1983年

共引文献278

同被引文献48

引证文献7

二级引证文献16

相关作者