摘要
本文根据城市污水处理工程的特点,提出从设计、施工、调试三个方面对项目的费用、进度和质量进行控制的方法和建议。
The paper puts forward the control measures and suggestions on costs, rate of progress and quality of project from the point of view of design, construction and trial adjustment in accordance with the characteristic of municiple sewage treatment projects.
出处
《中国环保产业》
2004年第5期6-8,共3页
China Environmental Protection Industry
关键词
城市污水处理
费用
进度
质量
控制
municiple sewage treatment
costs
rate of progress
quality
control