4Mirksy G, Haggerty D. Developments in cooling tower components[J]. Hydrocarbon Engineering, 2000, 28(10): 75-78.
5Burger R. Cooling Tower fill the neglected moneymaker [J]. Hydrocarbon Processing, 2000, 30(5): 65-68.
6Donald Zelek. Guidelines for selecting the proper film fill[J]. CTIJournal, 2007, 28(6): 28-34.
7Barile R G, Dengler J L, Hertwig T A. Performance and design of a turbulent bed cooling tower[J]. AICHE Symposium Series, 1974, 70(138): 154-162.
8Dessouky H. Thermal and hydraulic performance of a three phase fluidized bed cooling tower[J]. Experimental Thermal and Fluid Science, 1993, 6(4): 417-426.
9Bedekar S, Nithiarasu P, Seethatamu K. Experimental investigation of the performance of a counter flow packed bed mechanical cooling tower[J]. Energy, 1998, 23(11): 943 -947.
10Goshayshi H, Missenden J. The investigation of cooling tower packing in various arrangements[J]. Applied Thermal Engineering, 2000, 20(1): 69-80.