5KESWANI A,SHACKLETON M B. How real option disinvestment flexibility augments project NPV[J]. European Journal of Operational Research,2006,168(1) :240-252.
6HUANG Xiaoxia. Chance-constrained programming models for capital budgeting with NPV as fuzzy parameters [J]. Journal of Computational and Applied Mathematics, 2007,198(1) : 149-159.
7VAN DER LAAN E. An NPV and AC analysis of a stochastic inventory system with joint manufacturing and remanufacturing[J]. International Journal Production Economics, 2003,81-82 (11) :317-331.
8VAN GROENENDAAL W J H. Estimating NPV variability for deterministic models[J]. European Journal of Operational Research, 1998,107(1) : 202-213.