摘要
A load-leveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time. An experimental simulation set up was designed and used to test the load-leveling function for a real pipeline system. A storage tank filled with activated carbon together with a filter constitutes the major part of the load-leveling facility. Pressure and temperature of the system, as well as the real gas output of the storage tank were recorded. It is proven that load-leveling by adsorption is technically feasible even for low pipeline pressure of natural gas supply system.
A load-leveling method through adsorption was presented to adjust the supply quantity according to the consumption rate of natural gas with time. An experimental simulation set up was designed and used to test the load-leveling function for a real pipeline system. A storage tank filled with activated carbon together with a filter constitutes the major part of the load-leveling facility. Pressure and temperature of the system, as well as the real gas output of the storage tank were recorded. It is proven that load-leveling by adsorption is technically feasible even for low pipeline pressure of natural gas supply system.
基金
Supported by the Science and Technology Commission of Tianjin and partly supported by the National Natural Science Foundation of China (No. 29936100).