摘要
从某火电厂50MW机组锅炉烟气除尘系统存在的缺陷入手,详细介绍了将原文丘里水膜除尘系统改造为EE型电除尘系统的工程实例,旨在为同类机组除尘系统的改造提供借鉴,以满足日益严格的环境标准要求。
Beginning with the defects of the dust-removing system of a 50 MW thermal power unit,a practical reconstruction from Venturi-collector to EE model ESP is introduced.It can provide a case for the reconstruction of similar units to satisfy the increasingly strict environmental standards.
出处
《电力环境保护》
2004年第2期34-36,共3页
Electric Power Environmental Protection