长输管道定向钻穿越断点段补救施工 被引量:1

Remedial Construction on Break-off at Directional Drilling Crossing of Long Distance Transmission Pipeline
下载PDF
导出
摘要 西气东输管道工程在郑州黄河北岸滩地设计三次定向钻穿越,在第二次穿越管道回拖过程中,钻具脱落,致使穿越施工无法继续进行。文章针对这一穿越工程事故,详细介绍了补救施工方法及其关键技术。根据工程的实际情况,采取大开挖方式将断点处管段返到变更后的设计高程,再采用沟埋敷设法完成剩余管道的穿越。通过采取分层取土、多级多型降水和钢板桩支护等一系列措施,实现了黄河滩地地表以下19m深处管道的成功对接。 Aimed at the accident of drilling tool break-off happened at directional drilling crossing through north bank of Yellow River in Zhengzhou in West to East Gas Pipeline Project, the remedial construction method and other related key techniques are introduced in detail. According to the practical situation, the large excavation method was used to shift the break-off pipe crossing segment to the altered design altitude, than the buried trench laying method was applied to accomplish remained pipeline crossing. After a series of measures, such as taking soil out layer by layer, lowering water level with types of multi-layer approaches and shoring with steel sheet piles, were adopted, the connection between the pipe at the depth of 19m and the ground pipe was successfully realized.
出处 《石油工程建设》 北大核心 2004年第3期44-47,共4页 Petroleum Engineering Construction
关键词 长输管道 定向钻穿越 事故 基坑开挖 降水 沟埋敷设 long distance transmission pipeline directional drilling crossing accident foundation pit excavation ground water lowering buried trench laying
  • 相关文献

同被引文献2

  • 1GB 50369-2006,油气长输管道工程施工及验收规范[S].
  • 2Q/SYGJX0114-2008,西气东输二线管道穿越工程施工技术规范[S].

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部