5# Blast Furnace of Baotou Steel Under Construction
-
1发挥优势为西部大开发作贡献[J].企业技术进步,2001(3):24-24.
-
22200m^3 BF Achieving Production Goal[J].China's Refractories,2004,13(2):42-42.
-
38.97 GW under construction and 2.60 GW to be commissioned in Shanxi Province this year[J].Electricity,2004,15(2):53-53.
-
4锌飞公司2005年一季度精铅产量较预期乐观[J].中国铅锌锡锑,2005(6):41-41.
-
5董玉贵,宋阳升.大功率氧煤燃烧器的研制[J].钢铁研究学报,1997,9(5):63-64. 被引量:2
-
6刘学明.以学习邯钢为动力 完善企业计量检测体系[J].中国计量,1996,0(12):14-15.
-
7A 1 260 m^3 Blast Furnace of Xilin Iron and Steel Group Put into Production in April[J].China's Refractories,2012,21(2):27-27.
-
8云南省优秀质量管理小组[J].云南冶金,2008,37(S1):2-2.
-
9乔军,柳召刚,马莹,张存瑞,郝先库.Study on Roast Reaction Kinetics of Baotou Concentrate of Rare Earth with 15% Na_2CO_3 Additions[J].Journal of Rare Earths,1999,17(1):71-74. 被引量:1
-
10赵世全.葫芦岛锌厂东方铜业公司生产检修两不误[J].中国金属通报,2001,0(Z1):26-26.