摘要
在水电站制定厂内机组最优负荷分配时一般都假设水电站的水头是不变的。然而,实际运行中,由于机组耗水等各种原因都会导致水头产生比较大的变化,这就要求优化分配原则要能满足水头变化的要求。利用网络图权值法和动态规划法,对这种情况进行分析研究。最后得出两种最优负荷分配的方法并给出了这两种方法的优缺点对比讨论,具有一定的普遍意义。
In the process of making optimal load dispatch plan in hydroelectric plants, it is usually supposed that the water head of the hydroelectric plant is not changing. However, during the practical operation, because of many respects, such as the water loss caused by generators, the water head always changes greatly. Consequently the optimal load dispatch plan should meet this kind of change. This paper focused on the study of new optimal load dispatch plan in such complicated condition. With network weight method and dynamic programming, two optimal schemes are proposed and tested. In the end, advantages and disadvantages of the two schemes are discussed. It is generally applicable in practical engineering program.
出处
《继电器》
CSCD
北大核心
2004年第12期29-31,共3页
Relay
关键词
水电站
水电机组
水头
最优策略
动态规划法
网络图权值法
数学模型
economic operation in hydroelectric station
dynamic programming
water-loss caused by starting and stopping of generator