三峡二期枢纽工程安全运行分析与评价

Analysis and Evaluation of Safe Operation of Three Gorges Phase Ⅱ Works
下载PDF
导出
摘要 长江三峡水利枢纽工程2003年实现了6月蓄水、通航,7月首批机组发电三大目标,进入围堰挡水发电期,开始发挥防洪、发电、航运等综合效益。目前,左岸电站已有8台700 MW水轮发电机组并网发电。累计发电量达215亿kW·h;船闸通过的货物量累计超过了3000万t。枢纽工程运行后检查及各建筑物监测资料表明,枢纽建筑物运行安全正常。 : At the Three Gorges project, reservoir impounding and navigation, and power generation from the first u-nits, by the construction of the phase III RCC cofferdam, have been achieved in June and July, 2003, respectively; the Three Gorges project has started to make overall contribution in flood control, solving energy shortage and improvement of navigation on the Yangtze river. Currently, eight 700 MW turbo-generators in the left powerhouse have come on the national power grid with a cumulative output of up to 21. 5 TWh; and a total of more than 30 Mt goods has passed through the shiplock. Inspections and monitoring data after operation have shown that all structures have operated safely.
作者 王小毛
出处 《中国三峡建设》 2004年第3期18-19,共2页 China Three Gorges Construction
关键词 三峡二期枢纽工程 安全运行 水轮发电机组 导流底孔 闸墩 Three Gorges phase Ⅱ works structure safety.
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部