重点介绍了 380t吊车梁施工过程中 ,在零部件下料、钢板拼接、构件组装、焊接、矫正以及构件的现场拼接、安装等方面采取的技术措施 。
It is emphasized that some suitable techniques of how to cut parts,splice plates,assemble members,as well as weld,correct,assemble and erect them on the site during the construction of crane beam(380t),thus ensuring the quality of the project.
出处
《钢结构》
2004年第3期59-61,共3页
Steel Construction
关键词
核电站
吊车梁
焊接
整体吊装
钢板拼接
工程质量
nuclear power station crane beam welding integral lifting measurs for ensuring quality