摘要
本文以广东省省道S113线阳春春城至潭水段改建工程为例,详细介绍了水泥稳定级配碎石基层的施工质量控制的几个环节。
This paper detailedly introduces several tache of quantity controlling for the construction of grassroots in cement and rank crushed stones, With the example of building S113 Yangchun city to Tanshui town.
出处
《广东交通职业技术学院学报》
2004年第2期56-57,共2页
Journal of Guangdong Communication Polytechnic