期刊文献+

紫坪铺工程引水隧洞群现场监测与仿真反演分析 被引量:2

In-situ Monitoring and Artificial Inverse Analysis on Headrace Tunnels at Zipingpu Project
下载PDF
导出
摘要 以紫坪铺工程引水隧洞群为研究对象 ,完成了跟踪隧洞施工过程的围岩变形监控量测 ,获取了围岩动态稳定性态 ,并利用监测结果进行了仿真反演分析 ,得到了相应洞段的宏观力学参数与初始地应力场 ,为指导下半洞施工。 For headrace tunnels at Zipingpu project , surrounding rock deformation monitoring was carried out during tunneling to get surrounding rock dynamic stability and artificial inverse analysis was carried out with monitoring results to obtain macro mechanics parameters and initial in situ stress field . These results provide reliable scientific basis for optimization design of tunnel construction and support in lower section.
出处 《四川水力发电》 2004年第2期12-14,32,共4页 Sichuan Hydropower
基金 四川省重点科技攻关项目 (编号 :0 2SG0 2 3 0 4 0 )
关键词 收敛监测 仿真反演分析 引水隧洞 优化设计 紫坪铺水利枢纽 convergence monitoring artificial inverse analysis headrace tunnel optimization design Zipingpu Water Conservancy Project
  • 相关文献

参考文献3

二级参考文献7

共引文献39

同被引文献19

引证文献2

二级引证文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部