期刊文献+

晋、陕、蒙协作绘新图共同开发北干流 被引量:1

Three Provinces in Drainage Area of Yellow River Cooperate to Develop Hydraulic Power Resource
下载PDF
导出
摘要 介绍了黄河中游北干流水力资源开发的最新规划,目前该河段水电开发的情况,分析了待建几个梯级水电站的技术经济指标,讨论了已建梯级电站的管理和未来开发电站的投资、管理模式,提出加快北干流水电开发的建议,供领导及有关机构决策参考。 This paper mainly describes the newest plan on hydraulic power resource development of middle reaches of the Yellow River ,presents the situation of hydraulic power resource development of the Yellow River is middle reaches present and analyzes some economic standards of several stop hydropower stations which will be build in the future. The author ,in this paper, also talks about the management system of some step hydropower stations which already have been built and gives some advices about accelerate the hydraulic power resource development of the Yellow River's middle reaches.
机构地区 天桥水力发电厂
出处 《山西电力》 2004年第3期62-63,68,共3页 Shanxi Electric Power
关键词 万家寨水利枢纽 水力资源 开发 技术经济指标 development plan,economic standard investment analysis management system
  • 相关文献

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部