1[1]Potter J F, Mercer J.Performance of the Crack and Seat Method for Inhibiting Reflection Cracking[R].Third RILEM International Conference on Reflective Cracking in Paverments,1996.
2[2]Potter J F, Dudgeon R, and Langdale P C. Implementation of Crack and Seat for Concrete Pavement Maintenance[R].Fourth RILEM International Conference on Reflective Cracking in Pavements, 2000.
3[3]HMSO. Specification for Highway Works, Volume 1, Clause 716(05/01),Cracking and Seating of Existing Jointed Unreinforced Concrete Pavements and CBM Roadbases[S].2001.
4[4]HMSO. Notes for Guidance on the Specification for Highway Works, Volume 2,Clause NG716(05/01), Cracking and Seating of Existing Jointed Unreinforcde Concrete Pavements and CBM Roadbases[S].2001.
5[5]Thompson M R. Breaking/Cracking and Seating Concrete Pavements[R].TRB,National Research Council, Washington D C,1989.
6[6]Wells G K, Hannon J B and Predoehi N H.California Experience with Cracking and Seating of Concrete Pavements[R].TRB, National Research Council, Washington D C,1991.
7[7]New York State Department of Transportation.Cracking and Seating Existing Portland Cement Concrete Pavement[R].1996.
8[8]Florida State Materials Office.Performance Evaluation of Crack and Seat Rehabilitation Projects on 1-10[R].2000.