青海省黑泉水库混凝土面板坝的工程地质问题与工程处理措施 被引量:3

ENGINEERING-GEOLOGICAL PROBLEMS OF CONCRETE FACE-PLATE DAM OF HEIQUAN RESERVOIR AND MEASURES FOR ENGINEERING TREATMENT IN QINGHAI PROVINCE
下载PDF
导出
摘要 黑泉混凝土面板坝高 1 2 3.5 0m ,位居中国已建成的混凝土面板坝第四。坝址地形破碎 ,构造发育 ,工程地质条件复杂 ,河床第四纪砂卵砾石层存在不利于坝体稳定和变形的夹层 ,大坝设计采取了一些独具特色的结构措施 ,较好地适应了特殊的地质条件。本文重点分析了大坝的工程地质条件及相应的工程处理措施。 The concrete face-plate dam of Heiquan Reservoir is 123.50 m high, the 4 th built high concrete face-plate dam in China. The landform at the dam site has been broken, the structures are developed, and the engineering-geological conditions are complex. The existence of Quaternary sand-gravel beds on the riverbed is unfavorable for the stability of the dam body. Thus, some specific structural measures were taken in design of the dam and well satisfied the specific geological conditions. This paper analyzes the engineering-geological conditions and the relevant engineering treatment measures.
出处 《工程地质学报》 CSCD 2004年第2期167-170,共4页 Journal of Engineering Geology
关键词 水库大坝 面板坝 工程地质 高趾墙 Concrete face-plate dam, Engineering geological condition, High-toe wall
  • 相关文献

参考文献4

  • 1陆兆溱.工程地质学(第二版)[M].北京:中国水利水电出版社,2002..
  • 2水利部水利水电规划设计总院.SL228-98混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999..
  • 3水利部水利水电规划设计总院.青海省黑泉水库蓄水安全鉴定报告[R].水利部水利水电规划设计总院,2002..
  • 4青海省水利水电勘测设计院.青海省黑泉水库初步设计阶段工程地质勘察报告[R].青海省水利水电勘测设计院,1994..

共引文献2

同被引文献12

引证文献3

二级引证文献18

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部