摘要
黑泉混凝土面板坝高 1 2 3.5 0m ,位居中国已建成的混凝土面板坝第四。坝址地形破碎 ,构造发育 ,工程地质条件复杂 ,河床第四纪砂卵砾石层存在不利于坝体稳定和变形的夹层 ,大坝设计采取了一些独具特色的结构措施 ,较好地适应了特殊的地质条件。本文重点分析了大坝的工程地质条件及相应的工程处理措施。
The concrete face-plate dam of Heiquan Reservoir is 123.50 m high, the 4 th built high concrete face-plate dam in China. The landform at the dam site has been broken, the structures are developed, and the engineering-geological conditions are complex. The existence of Quaternary sand-gravel beds on the riverbed is unfavorable for the stability of the dam body. Thus, some specific structural measures were taken in design of the dam and well satisfied the specific geological conditions. This paper analyzes the engineering-geological conditions and the relevant engineering treatment measures.
出处
《工程地质学报》
CSCD
2004年第2期167-170,共4页
Journal of Engineering Geology
关键词
水库大坝
面板坝
工程地质
高趾墙
Concrete face-plate dam, Engineering geological condition, High-toe wall