摘要
本文通过对元宝山发电厂300MW机组轮流循环泵并联运行的试验研究,采用加装旁通管路的循环水系统改造方案,解决了该机组两台循环泵长期不能并联运行的问题.
Through the experimental testing parallel operation of 300MW unit's axial circulating water pumps in Yuanbaoshan Power plant, the modification concept that a crossover piping is installed in the circulating water pump system has been adopted to solve a problem that two circulating water pumps of this unit can not be operating in parallel. Figs 6 and refs 3.
出处
《动力工程》
CSCD
1993年第5期45-51,共7页
Power Engineering