摘要
本文对当前已投运的四种型号的75t/h循环流化床锅炉的运行状况和存在的问题作了详细的分析;为达到国家经贸委提出的三年完善化示范工作的目标,提出了相应的改进措施.
In the paper,the author discusses in detail the operation stasus and existing problems of four types of domestic-manufactured 75t/h circulation fluid-ized bed boilers already put in operation. Corresponding improvements are suggested in order to achive'the demostration target of three years' perfection' put forward by the State Committee of Economy And Trade.
出处
《动力工程》
CSCD
1993年第6期24-27,32,共5页
Power Engineering