电站优化检修的实践与认识 被引量:2

Practice and realization of optimized maintenance
原文传递
导出
摘要 优化检修体现了设备的全过程动态管理 ,将原来单一的计划检修变更为定期检修、状态检修和故障检修共存的检修方式 ,是检修管理策略的变革。优化检修包括策略分析、设备管理、故障诊断等各类别工作 ,既独立又有联系 ,电厂应根据自身的实际情况分类别。 Optimized maintenance which represents total process assets management has changed the previously single time-based maintenance into the multi-mode maintenance method including planned maintenance, condition-based maintenance and corrective maintenance. It has brought reform to management strategy of maintenance. Optimized maintenance includes such work as strategy analysis, equipment management and fault diagnosis which are independent and interactive at the same time. Power plants should carry out optimized maintenance stage by stage and category by category based on their own situation.
出处 《华东电力》 北大核心 2004年第6期20-23,共4页 East China Electric Power
关键词 优化检修 状态检修 PDM 设备管理 optimized maintenance condition-based maintenance PDM equipment management
  • 相关文献

参考文献3

  • 1孙惟东,陆一春.发电设备实施状态检修的思考[J].华东电力,2000,28(4):37-39. 被引量:12
  • 2EPRI. predictive Maintenance Guideline [ R ]. TR-103374,1994.
  • 3EPRI. Streamlined Reliability-Centered Maintenance (SRCM) Implementation Guidelines [R].TR-109795-V3,1999.