针对转炉汽化冷却和净化除尘两个系统的主要技术参数进行了分析,指出了系统运行中存在的具体问题,对汽化除尘设施的运行状况做出了总体性的评价。
By analyzing the main technical parameter of vaporated cooling system and purified dusting system of converter, its change law is found out and the concrete problems existing during the running is pointed out. The overall assessment on the running of the vaporated dusting device has been made.
出处
《天津冶金》
CAS
2004年第3期21-24,共4页
Tianjin Metallurgy