摘要
本文重点介绍了中国铝业山西分公司热电站首次开展的热力系统汽水平衡测试过程,并就测试结果进行了分析,指明了中间环节物流转换情况与节能降耗挖潜努力方向。
This paper introduced with emphases on steam and water balance testing process in heat power system in China Aluminium Industry Shanxi Branch. Based on analysing result, pointed out that the material flow situation and the way of making great efforts orientation and taping the latent power.
出处
《有色冶金节能》
2004年第3期13-14,共2页
Energy Saving of Nonferrous Metallurgy
关键词
热电站
热力系统
汽水平衡
物流
heat and power station
heat power system
steam and water balance
matrial flow