摘要
介绍小西湖黄河主桥斜拉桥主要施工方案、质量预控措施和施工过程中所遇到的问题及处理办法,对索塔、斜拉索的施工技术和施工工艺做了重点阐述。
Focusing on the construction techniques of cable bent tower and diagonal cable, this paper makes complete illustration of construction scheme, quality preventive measures and problems and treatment in construction of Xiaoxihu Yellow River Main Bridge.
出处
《工程质量》
2004年第1期23-28,共6页
Construction Quality