摘要 龙滩水电站为我国目前在建的第二大水电工程,也是我国对特大型水轮发电机组首次采取国内招标.机组单机容量700MW,在电力系统中担任调峰、调频和事故备用,其设计、制造难度已达到甚至超过当今世界水平.本文对发电机主要特点和性能参数等进行了分析、概括和总结,可供各位同仁参考. The Longtan Hydropower Station is the second largest hydropower station in China under construction. The unit has been procured through domestic bidding, which is the first of its kind (super,large,capacity units) in China. The generating units, rated at 700 MW, will undertake the tasks of peak and frequency regulation as well as emergency standby in the power system,the design and manufacture complexities of the generating units have reached or exceeded the world advanced level. This paper presents the construction characteristics and technical performance parameters of the hydraulic turbo,generator units of the Longtan Hydropower Station. It may be used for your reference.
作者 徐立佳
出处 《水利水电技术》 CSCD 北大核心 2004年第5期68-70,共3页 Water Resources and Hydropower Engineering
关键词 龙滩水电站 发电机 特点 参数 the Longtan Hydropower Station generator characteristics parameters
  • 相关文献

同被引文献12

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部