摘要
通过对斋家冲尾矿库排水斜槽结构强度演算及危险分析,采用埋设加固方法进行工程改造,达到了预想效果。
Through constructrual strength calculation and danger analysis of drain tank of Zhaijiachong tailingspool, buried consolidation method is adopted to carry on the project reformation, and expected effect has been obtained.
出处
《中国矿山工程》
2004年第4期37-40,共4页
China Mine Engineering
关键词
尾矿库
结构强度
加固
tailings pool
structrual strength
consolidation