摘要
CMM(能力成熟度模型 )的每个成熟级别由关键过程域 (KPA)组成 ,每个KPA确定一组相关活动。为了有效地进行这些活动 ,需要在整个软件开发过程中引入相关工具 ,帮助软件企业或开发团队实施CMM。论述了实施CMM需要的主要工具 ,包括软件开发过程框架、需求管理工具、面向对象的分析设计工具、配置管理工具、变更管理工具和软件测试工具。
Each maturity level of CMM(Capability Maturity Model) consists of KPA(Key Process Area),each KPA consists of a group of activity. In order of carry through those activity effectively, the tools must be introduced through software development process for putting CMM in practice. This paper presents main tools for implementing CMM, include software development process framework, requirement management tool, analysis & design tool, configure management tool, change management tool,and software test tool.
出处
《舰船电子工程》
2004年第4期20-22,75,共4页
Ship Electronic Engineering