期刊文献+

电梯规划的动态模型 被引量:8

The Dynamic Model for Elevators
下载PDF
导出
摘要 讨论了写字楼上下班高峰期的电梯规划问题。首先提出了电梯方案的衡量标准,然后建立了一个比较完整的“动态规划”模型,对模型进行了求解。最后,对结果作了进一步的讨论,讨论了该模型对一般建筑以及超高建筑规划时候结果的不同,并回过头来验证了衡量标准的正确性。最后根据一个实际问题给出解决的方案。 In this paper,we discuss how to distribute workload among elevators in business buildings during rush hours.First,we analyze the problem and propose a benchmark to evaluate different distribution schemes.Then we establish a relatively comprehensive″dynamic programming″model to work out the solutions.Last,we have a further discussion on the result,illustrate the difference between normal buildings and those extremely high ones,and return to demonstrate the validity of the benchmark we have developed.In addition,we apply the model to a real-life problem and bring forward a solution.
作者 马潇 吴子贵
出处 《计算机工程与应用》 CSCD 北大核心 2004年第18期221-224,共4页 Computer Engineering and Applications
关键词 电梯规划模型 动态规划 elevator programming,dynamic model
  • 相关文献

参考文献4

  • 1胡运权.运筹学教程[M].北京:清华大学出版社,1999.112-120.
  • 2Thomas H Cormen Charles.算法导论[M].影印版,高等教育出版社
  • 3王凌.智能优化算法及其应用[M].北京:清华大学出版社,2000..
  • 4M H Alsuwaiyel.算法设计技巧与分析[M].英文版,电子工业出版社

共引文献41

同被引文献32

引证文献8

二级引证文献14

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部