期刊文献+

关塘铁矿斜井井筒施工中流沙及涌水的防治

Prevention of Drifting Sand and Water Production in Inclined Mine Shaft Construction
下载PDF
导出
摘要 关塘铁矿提升斜井原预计涌水量小于 3 4m3/h ,斜井要穿越较厚的第四系冲积层和流沙层。在井筒掘进过程中 ,关塘铁矿遭遇了几次特大涌水和流沙等危害 ,通过采用注浆堵涌及挤压注浆固沙相结合的方案 ,解决了上部井筒渗水、淋水现象 ,井筒最终出水量小于 10m3/h 。 It’s estimated that the water production rate would not larger than 34m^(3)/h during digging Guantang Iron Mine’s drafting inclined mine, and the inclined shaft should go through the thicker alluvium and flowing sand layer. In course of the construction, Guantang Iron Mine encountered some times specially flow of water and sand. The water seepage of upper shaft is resolved by injecting concrete and pressing it to consolidate the sand at the same time. The final leakage is less than 10m^(3)/h. Therefore the construction is ensured.The shaft goes safely through the layer of soft earth and flowing sand which contains large amount of water.
作者 杨延义
出处 《山东冶金》 CAS 2004年第3期9-11,共3页 Shandong Metallurgy
关键词 斜井井筒 涌水 流沙 壁后注浆 加固技术 关塘铁矿 inclined shaft flow of water flow of sand inject concrete upon the well consolidation technology
  • 相关文献

参考文献1

共引文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部