摘要
本文根据模糊数学和非线性规划的理论,建立模糊非线性规划数学模型(FNLP),较好地处理了单一综合利用水库各目标之间的不可比性问题。本文以四川省紫坪铺水库规划为算例,获得满意结果。
Using the theories of fuzzy mathematics and nonlinear programming, the mathematic model of fuzzy-nonlinear programming is proposed, which treats the incomparability between the objectives of the multlple-purpose reservoir well, The mathematic model is applied to a real example and receives a good result
关键词
水库非线性规划
模糊数学
fuzzy-nonlinear programming, incomparability, Multiple-purpose reservoir