摘要
在总长度 2 5 2m的超长不设缝地下室顶板中 ,采用了预应力、设置后浇带等综合抗裂技术 ,并对有粘结预应力平板的设计理论、施工工艺、锚固体系及超长结构预应力损失控制和抗裂控制作了深入研究。
In construction of the 252m no-seam basement head plate, engineers adopted many comprehensive anti-crack technologies such as prestress, post-pouring zone and so forth, studied some aspects of a cohesive prestressed flat plate such as design principles, construction methods, anchor systems and so on, and researched prestressed loss control methods and anti-crack control methods of ultra-long structures.
出处
《施工技术》
CAS
北大核心
2004年第7期37-38,共2页
Construction Technology
关键词
预应力工程
超长结构
有粘结预应力
施工
prestressed engineering
ultra-long structure
cohesive prestress
construction