摘要
针对神头第一发电厂二单元 2台苏制汽轮机投产以来一直存在中压缸温差大的问题 ,从系统、保温和停机方式几方面分析了其原因 ,并给出相应的整改措施 。
The temperature-related problem of the big gap between the upper and lower casing has been existent since the two steam turbines (K-200-130-3 made by the former USSR in the second unit of the Shentou power plant) were put into operation. The problem can be discovered by the records of the start-up and shutdown of the unit, which seriously affect the safe operation and warming start-up. The analysis of the problem, which is the key point, has been conducted in this dissertation.
出处
《电力学报》
2004年第2期150-152,共3页
Journal of Electric Power