准格尔发电厂汽包水位测量装置异常的原因及改进 被引量:1

CAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT
下载PDF
导出
摘要 对准格尔发电厂 1号、2号锅炉水位测量装置 (单室平衡容器 )准确性和可靠性差的原因进行了分析 ,并进行了将汽侧连通管与水侧连通管完全隔离的改进。经实际水位升降试验检验 ,改进后的平衡容器能实现汽包水位的正确测量 ,汽包水位指示值不再出现飞升现象。 The causes leading to poor accuracy and bad reliability of water-level measuring facility (single chamber equilibrium container) for boiler No 1 and No 2 in Zhunge’r Power Plant have been analysed, and retrofit of completely isolating the connecting pipe on the steam side and that on the water side being carried out. Through inspection of practical water-level rising and lowering test, the correct measurement of drum-level can be realized by using the equilibrium container after retrofitting, the jump phenomenon of drum-level indicating value never occurred again.
作者 畅世吉
机构地区 准格尔发电厂
出处 《热力发电》 CAS 北大核心 2004年第8期45-47,共3页 Thermal Power Generation
关键词 准格尔发电厂 锅炉 水位测量装置 变送器 水位计 power plant boiler drum-level waterCAUSES LEADING TO ABNORMALITY IN MEASUREMENT USING DRUM-LEVEL GAUGE IN ZHUNGE’R POWER PLANT$$$$ CHANG Shi-ji Abstract:The causes leading to poor accuracy and bad reliability of water-level measuring facil
  • 相关文献

同被引文献2

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部