摘要
文华大厦因设计变更,需在已施工的楼层上施工钻孔灌注桩,通过对主要受力部分AB梁进行力学分析,以及对其进行加固,解决了楼层上钻孔灌注桩施工难题。
Due to the change of design of Wenhua Mansion, bored piles need constructed on the storey which has been constructed. Through the mechanics analysis of the mayor component-beam AB and the reinforcement of the beam, the construction problems of bored pile on storey were solved.