烟台港西港池(一期)陆域形成及强夯加固

Land Formation and Dynamic Consolidation for the West Basin (1st Phase) of Yantai Port
下载PDF
导出
摘要 烟台港西港池一期工程,自1985年正式动工,1990年全部竣工投产.其中,在软基上填海造陆46万平方米,采用强夯法加固大面积人工杂填地基,共计26万平方米,其上除货场道路、管线外,还有生产及生活建筑.共计7万多平方米.强夯加固取得了比较满意的技术经济效果. The work on the first phase of the West Basin of Yiantai Port was commenced in 1985 and was completed and put into operation in199(?) A total of 160 000 of land was reclaimed on the original soft soil. 260 000 of the reclaimed land, formed by miscellaneous fills, was treated by dynami(?) consolidation and more than 7 00 out of the dynamically compacted land was utilized tor building reads, laying pipelins and erecting productive buildings and living quarters. The dynamic consolidation method has generated sa(?)siactory techl and onomical results.
作者 战和增 曲杰
出处 《港口工程》 1993年第1期22-31,共10页