期刊文献+

大顶子山船闸输水系统设计的演变 被引量:1

Develoment of Dadingzishan Shiplock Filling & Emptying System Design
下载PDF
导出
摘要 大顶子山船闸输水系统曾进行了集中输水,闸墙长廊道侧短支孔输水闸墙长廊道闸室长度1/4与3/4横支廊道倒口输水3个方案的设计,并分别进行了水力学模型试验和水力计算分析。根据试验成果和计算分析来看输水系统设计的演变,是有现实意义的。 Three schemes were designed for water filling && emptying system of Dadingzishan Shiplock, i.e., concentrated filling && emptying system; lock wall long culvert-side short hole filling && emptying system; lock wall long culvert -transverse branch culvert of 1/4 and 3/4 length of lock chamber inverted opening filling && emptying system, to which hydraulic model test and hydraulic calculation analysis were carried out respectively. It is of realistic significance to consider the water filling && emptying system design according to test result and calculation analysis.
出处 《水运工程》 北大核心 2004年第8期44-49,共6页 Port & Waterway Engineering
关键词 大顶子山船闸 输水系统 设计 Dadingzishan Shiplock water filling && emptying system design
  • 相关文献

参考文献7

  • 1[1]船闸输水系统规划及予可阶段设计方案水力计算分析与对船闸防冰的认识[R].天津:天津水运工程科学研究所,2003.
  • 2[2]大顶子山船闸集中输水系统水工模型试验报告[R].天津:天津水运工程科学研究所,2003.
  • 3[3]船闸分散输水系统设计方案水力计算与下游引航道停泊条件分析[R].天津:天津水运工程科学研究所,2003.
  • 4[4]张桂芬,宗慕玮.湖南省湘江大原渡枢纽船闸水力学模型试验报告[R].南京:南京水利科学研究院,1995.
  • 5[5]苑润保,等.大藤峡船闸输水系统试验研究[R].长春:东北勘测设计研究院水利科学研究院,1996.
  • 6[6]李云,等.西江水运主通道通航船闸输水系统关键技术研究[R].南京:南京水利科学研究院,2003.
  • 7[7]乔文荃,等.广西长洲水电枢纽船闸水力学试验研究[R].南京:南京水利科学研究院,1993.

同被引文献24

引证文献1

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部