摘要
大顶子山船闸输水系统曾进行了集中输水,闸墙长廊道侧短支孔输水闸墙长廊道闸室长度1/4与3/4横支廊道倒口输水3个方案的设计,并分别进行了水力学模型试验和水力计算分析。根据试验成果和计算分析来看输水系统设计的演变,是有现实意义的。
Three schemes were designed for water filling && emptying system of Dadingzishan Shiplock, i.e., concentrated filling && emptying system; lock wall long culvert-side short hole filling && emptying system; lock wall long culvert -transverse branch culvert of 1/4 and 3/4 length of lock chamber inverted opening filling && emptying system, to which hydraulic model test and hydraulic calculation analysis were carried out respectively. It is of realistic significance to consider the water filling && emptying system design according to test result and calculation analysis.
出处
《水运工程》
北大核心
2004年第8期44-49,共6页
Port & Waterway Engineering
关键词
大顶子山船闸
输水系统
设计
Dadingzishan Shiplock
water filling && emptying system
design