摘要 A-B法是一种污水处理新工艺。本文介绍了 A-B 法处理城市污水的中试结果及拟建20000m^3/d 污水处理工程采用 A-B 法处理的工艺设计参数及技术经济分析。当 A级曝气时间为0.5h、B 级为2.0h、污泥负荷分别为2.0~4.0和0.2~0.4kgBOD_5/(kgMLSS·d)时,COD 去除率为80%,BOD 为90%。采用 A-B 法较普通活性污泥法节省投资、运行费和占地面积,且运行稳定,对水质变化适应能力强。 This is a new technology of wastewater treatment.The result of a pilot plant to treat urban wastewater by A-B method and the design criteria and economic analysis of a programming urban wastewater treatment plant on the base of A-B method with capacity 20000 cubic meters per day are described here.When the aeration times in A-stage and B-stage are 0. 5hrand 2.0hr,sludge loadings are 2-4 kg BOD/kg MLSS and 0.2-0.4 kg BOD/kg MLSS respectively,obtained COD and BOD removals are 80% and 90% respectively.Comparing with conventional activated sludge process,A-B method can save investment,operation expenses and field area with extra advantages of stable performance and flexible to fluctuation of raw wastewater on quality.
出处 《给水排水》 CSCD 1993年第11期20-23,共4页 Water & Wastewater Engineering
  • 相关文献

同被引文献3

  • 1马炳勇,鲁承虎,孔令勇,等.乌鲁木齐河东污水处理厂初步设计说明书[R].西安:中国市政西北设计研究院,1994.
  • 2许月英,王克华,叶尔肯.乌鲁木齐市河东污水处理工程环境保护设施俊工验收监测报告[R].新疆:新疆维吾尔自治区环境监测中心,1999,10.
  • 3邱慎初.AB污水处理工艺[J].中国给水排水,1991,7(1):25-30. 被引量:10

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部