摘要
:深入探讨了集成化企业模型并行仿真系统中的仿真时钟管理机制,解决了多个子过程共同使用一个独占型资源时的时钟同步问题和多事件仿真中活动数量限制造成的时钟同步问题以及多个线程之间的时钟同步问题。
This paper discusses the simulation clock management system in the parallel simulation system for integrated enterprise model. In this endeavor, it specifically tries to demonstrate how to address the problem of clock synchronization which may results from several sub-processes sharing one exclusive resource or from there being a limited number of activities in operation in the multi-task simulation process or from several threads.
出处
《计算机工程》
CAS
CSCD
北大核心
2004年第14期169-171,共3页
Computer Engineering
基金
上海市科委科研计划资助项目(031111009
032012023)
关键词
并行仿真
集成化企业模型
仿真时钟
Parallel simulation
Integrated enterprise model
Simulation clock