摘要
本文论述了在广州蓄能电站的二期工程中应用同位素技术对工程的围岩段进行了水文地质调查,为工程提供了可靠的水文地质参数。
The use of isotopic technique for hydrogeologic survey in the second stage of Guangzhou power station project is stated in this paper, which provides reliable hydrogeologic parameters for the works.
出处
《工程勘察》
CSCD
北大核心
1993年第2期32-36,共5页
Geotechnical Investigation & Surveying