摘要
本文以河北省邯峰电厂和村盆地王凤水源地为例,探讨有限单元法在实际运用中的边界处理,参数确定,流场拟合等主要问题及其局限性。
The main problems of FEM in the practical use for boundary treatment, parameter determination and so forth and its limitation are discussed herein by taking the water source of Hanfeng Power Plant as an example.
出处
《工程勘察》
CSCD
北大核心
1993年第5期27-29,14,共4页
Geotechnical Investigation & Surveying