摘要
润扬大桥的北锚采取带案投标方式 ,变更的建设方案与初设阶段方案有较大变化 ,本文对两方案作了锚体 -基础 -土体三维变形和应力的有限元分析比较 ,得出修改方案较原方案更经济合理 ,更适合施工 。
The construction scheme of Runyang Bridge's north anchor is decided through bidding with the original scheme,and the modified scheme has been changed greatly.Based on 3 D FEM analysis,the two schemes are compared.The result is that the later is economical and has advantage in construction than the former.According to this,the later has been selected.
出处
《安徽建筑工业学院学报(自然科学版)》
2004年第1期25-29,共5页
Journal of Anhui Institute of Architecture(Natural Science)