期刊文献+

表面流人工湿地处理生活污水的研究 被引量:45

Treating domestic sewage by the free-water surface constructed wetlands
下载PDF
导出
摘要 通过小试装置研究了表面流人工湿地对人工模拟生活污水的处理效果及相关运行参数。实验结果表明,表面流人工湿地系统对污水中的CODCr、TN、TP均有较好的综合净化能力,对各种污染物指标的去除率可分别达到CODCr 75%、TN 75%、TP73%,其中CODCr和TN达到一级排放标准分别需3 d和4 d的表观停留时间,TP要达到二级排放标准则需6 d的表观停留时间。而且,湿地植物对TN和TP的去除有比较明显的促进作用。 In this paper, the performance of treating laboratory domestic sewage by the free-water surface constructed wetlands was investigated by the pilot scale free-water surface constructed wetland. The removal efficiency and operation parameters was acquired. According to our results, the removal efficiencies of CODCr, TN, and TP are 75%, 75% and 73% respectively. The apparent retention time of the domestic sewage should be 3 or 4 days at least for CODCr, TN to meet the Class 1 discharge standard of pollutants for municipal wastewater treatment plant, and 6 days at least for TP to meet the Class 2 discharge standard. And there are significant different removal efficiency of TN and TP between wetland with plants and non-plant.
出处 《生态环境》 CSCD 2004年第2期180-181,共2页 Ecology and Environmnet
基金 国家"十五"重大科技专项(2002AA601023) 江苏省高校省级重点实验室开放基金项目(KJS03071)
关键词 生活污水 表面流人工湿地 净化处理 domestic sewage free-water surface constructed wetlands purification treatment
  • 相关文献

参考文献5

  • 1COMIN F A,ROMERO J A,ASTORGA V,et al.Nitrogen removal and cycling in restored wetlands used as filters of nutrients for agricultural runoff [J].Wat Sci Tech,1997,35(5):255-261.
  • 2CARLETON J N,GRIZZARD T J,GODREJ A N,et al.Factors affecting the performance of stormwater treatment wetlands[J].Wat Res,2001,35(6):1552-1562.
  • 3诸惠昌,胡纪萃.新型废水处理工艺——人工湿地的设计方法[J].环境科学,1993,14(2):39-43. 被引量:93
  • 4陈若敦.环境监测实验[M].上海:同济大学出版社,1993..
  • 5吴晓磊.人工湿地废水处理机理[J].环境科学,1995,16(3):83-86. 被引量:456

二级参考文献6

共引文献524

同被引文献570

引证文献45

二级引证文献508

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部