电力市场发电机组检修计划的快速算法 被引量:37

FAST ALGORITHM OF GENERATOR MAINTENANCE SCHEDULING IN ELECTRICITY MARKET
下载PDF
导出
摘要 电力市场下发电机组检修计划的安排不当是造成近几年大停电的原因之一。电力市场机组检修计划需要兼顾可靠性与经济性两个方面。采用Benders分解法可以将这个高维度、非线性、混合整数随机规划问题分解为主问题和子问题求解:主问题是一个多目标整数规划问题,而子问题则是一个非线性随机问题。针对Benders分解法求解效率不高的问题,求解主问题时利用了机组检修连续性的特点,对Balas隐枚举法中的前向搜索部分和回溯部分进行了改进;求解子问题时,利用了半不变量法的偏导数解析表达式来求对偶乘子。对IEEE-RBTS和IEEE—RTS系统中所有发电机组安排了全年的检修计划,测试表明所提出的算法快速、有效。 The unsuitable generator maintenance scheduling under the electricity market environment is one of the important factors that causes the power system blackout, while the proper one should be designed to stress both the reliability and economies. The Benders decomposition method can divide this large scale, non-linear, mixed-integer stochastic programming problem into two problems: a deterministic multi-objective integer programming master problem and a stochastic, non-linear operation sub-problem. Several methods are used to increase the efficiency of the Benders decomposition method. The continuity of generator maintenance is used to modify the forward detection part and the backup trace part of the implicit enumeration method to solve the master problem. The analytic method based on the Cumulants method is utilized to calculate (he dual multipliers of Benders cut. The proposed method is applied to make maintenance scheduling for all the generators through 52 weeks in the IEEE-RBTS and IEEE-RTS system. The test results show that this algorithm is effective and fast.
出处 《电力系统自动化》 EI CSCD 北大核心 2004年第16期41-44,78,共5页 Automation of Electric Power Systems
基金 国家自然科学基金资助项目(50107005)。
关键词 电力市场 发电机组检修计划 BENDERS分解法 半不变量法 electricity market generator maintenance scheduling Benders decomposition Cumulants method
  • 相关文献

参考文献12

二级参考文献44

  • 1..发电设备可靠性评价规程(暂行)[S].电力部电力可靠性管理中心,1997.12..
  • 2[1]Endrenyi J, Anders G J, Leite da Silva A M. Probabilistic evaluation of the effect of maintenance on reliability-an application[J].IEEE Trans on Power Systems, 1998, 13 (2): 576-583.
  • 3[2]EL-Sheikhi, Farag A, Billinton Roy. Generating unit maintenance scheduling for single and two interconnected systems [J]. IEEE Trans on Power Systems, 1984, PAS-103 (5): 1038-1043.
  • 4[3]Fabrice Fourcade,Thierry Eve,Thierry Socroun. Improving lagrangian of pressurized water reactor outages[J].IEEE Trans on Power Systems, 1997,12 (2): 919-925.
  • 5[4]Hyunchul Kim,Yasuhiro Hayashi,Koichi Nara.An algorithm for thermal unit maintenance scheduling through combined use of GA SA and TS [J]. IEEE Trans on Power Systems,1997,12(1):329-335.
  • 6[5]Zurn H H,Qintana V H. Generator maintenance scheduling via successive approximation dynamic programming[J]. IEEE Trans on Power Apparatus and Systems, 1975, PAS-94 (1): 665-671.
  • 7[6]Zia Yamayee, Kathleen Sidenblad. A computationally efficient: optimal maintenance scheduling method[J]. IEEE Trans on Power Apparatus and Systems, 1983, PAS-102 (2): 330-338.
  • 8[7]Garver L L. Adjusting maintenance schedules to levelize risk [J]. IEEE Trans on Power Apparatus and Systems, 1972, PAS-91 (5): 2057-2063.
  • 9[8]Stremel J P, Jenkins. Maintenance scheduling under uncertainty [J].IEEE Trans on Power Apparatus and Systems,1981,PAS-100 (2): 460-465.
  • 10[9]Satoh T, Nara K. Maintenance scheduling by using simulated annealing method[J]. IEEE Trans on Power Systems, 1991,6 (2): 850-856.

共引文献441

同被引文献318

引证文献37

二级引证文献265

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部