摘要
结合太钢第二炼钢厂新增 3号连铸机水处理系统铁皮坑工程 ,介绍了以地下连续墙为基坑支护方式的施工工艺流程及有关施工方法和措施 ,以解决施工过程中的难点。
Combined with the project of new 3# continuous casting machine dealing with watre system iron sheet pit in No.2 factory of Taiyuan Stlle & Metal Company,it in troduces the constructing technology procedure of under gound continuous wall as basic pit maintaining model and relative constructing methods and meatures,which prorides referential application for the same kind projects.
出处
《山西建筑》
2004年第17期88-89,共2页
Shanxi Architecture