三板溪面板堆石坝坝体变形控制 被引量:4

Dam deformation control of concrete faced rockfill dam of Sanbanxi Hydropower Project
下载PDF
导出
摘要 对面板堆石坝而言,坝体变形控制是设计和施工的首要问题。三板溪水电站主、副坝均为面板堆石坝。主坝最大坝高185.5m,建于峡谷河段,筑坝材料为超硬岩及强风化料,岩性复杂,填筑工期短;副坝最大坝高92.1m,上下游均为贴坡坝型,坝基地形特殊,以上条件对控制坝体变形均不利。在设计中,从坝基开挖处理、坝料选配、坝体分区、填筑要求、施工程序和进度安排等方面均采取了措施,以减少这些不利影响,保证大坝安全运行。 For the concrete faced rockfill dam, the deformation control is the key to the design and construction. The main dam and the secondary dam of Sanbanxi Hydropower Project are all concrete faced rockfill dam. The main dam has a maximum height of 185.5 m, built in the narrow reach. The dam materials are super-hard rock and intensely-weathered rock with complex lithology and the short filling duration. The secondary dam has a maximum height of 92.1 m, with special topographic conditions of dam foundation. The upstream and downstream ofdam are all placed close to the slopes, All of above conditions are adverse to the dam deformation control. In order to assure operation safety of the dam, a series of measures on dam foundation excavation, dam material selection and gradation, dam body zoning, rockfill, construction procedures and schedules have been adopted in the design to decrease these adverse influences.
出处 《水力发电》 北大核心 2004年第6期27-29,共3页 Water Power
关键词 面板堆石坝 坝体变形 筑坝材料 控制措施 三板溪水电站 concrete faced rockfill dam dam deformation dam material control measures Sanbanxi Hydropower Project
  • 相关文献

同被引文献25

  • 1曹克明,方大凤,杨世源,樊友海,向世武.天生桥混凝土面板堆石坝的设计[J].国际水力发电,1992,44(4):36-39. 被引量:1
  • 2蒋国澄.中国的混凝土面板堆石坝[J].水力发电学报,1994,13(3):67-78. 被引量:10
  • 3李宝勇,杨宏伟.三板溪水电站面板堆石坝料场规划与开采[J].贵州水力发电,2005,19(6):26-29. 被引量:1
  • 4王南兵.大坳水库混凝土面板堆石坝利用软岩筑坝设计[J].水利规划与设计,2007(5):66-67. 被引量:6
  • 5COOKE J B. Empirical design of concrete face rockfill dams[J]. International Water Power & Dam Construction, 1998.
  • 6SL228-98混凝土面板堆石坝设计规范[S].北京:中国水利水电出版社,1999.
  • 7DL/T5016-1999混凝土面板堆石坝设计规范[S].北京:中国电力出版社,1999.
  • 8COOKE J B, SHERARD J L. Concrete face rockfill dams: Ⅱ design[J]. Journal of Geotechnical Engineering, ASCE, 1987, 113(10): 1096- 1112.
  • 9MACEDO G G, CASTRO J A, MONTANEZ L C. Behavior of Aguamilpa Dam[C]//The 20th ICOLD Congress and Beijing 2000 Symposium on Concrete Face Rockfill Dams. Beijing, 2000: 117- 152.
  • 10冯业林,张宗亮.天生桥一级水电站混凝土面板堆石坝[M]//中国当代土石坝工程.北京:中国水利水电出版社,2004:154-168.