摘要
针对株洲站北咽喉接触网改造施工中运输、安全、投资、工期的具体要求与现实情况,本文对道岔调整、新旧接触线对接工艺、接触网软横跨施工等提出了优化措施与实施方案,在今后的既有电气化改造施工中具有一定的借鉴意义。
To the detailed requirements of transportation, safety, investment, terminal schedule and the actual situation of OCS reconstruction in northern throat area of Zhuzhou station, proposes the optimized measures and implementation plan for switch point, connection between new and the existing contact wire, head-span of OCS, these have some certain reference value for reconstruction of existing electrified railway in the future.
出处
《电气化铁道》
2004年第4期24-26,共3页
Electric Railway
关键词
株洲站北咽喉
道岔定位
过渡工程
接触网优化:对接
northern throat area in Zhuzhou station
location of switch point
transitional project
optimizing of OCS
butt joint